Episode 9 of The Machine Shop: Today, after digging a trench in the floor to reroute the sewer lines to the future bathroom location, it’s time to fill the trench back up with gravel to prep for a new concrete slab!
Tay shifts focus to the dirty ceiling after the first load of gravel. How successful will he be at pressure washing what is likely 100 years of grease, dust, and dirt off the old pine ceiling joists?