CANADA'S LEADING INFORMATION SOURCE FOR THE METALWORKING INDUSTRY

LATEST MAGAZINE

CANADA'S LEADING INFORMATION SOURCE FOR THE METALWORKING INDUSTRY

CANADA'S LEADING INFORMATION SOURCE FOR THE METALWORKING INDUSTRY

GM makes historical investment in EV manufacturing capacity

Share This Post

General Motors Co. is investing more than $7 billion in four Michigan manufacturing sites to significantly increase battery cell and electric truck manufacturing capacity. This is the single largest investment announcement in GM history.

The investment includes construction of a new Ultium Cells battery cell plant in Lansing and the conversion of GM’s assembly plant in Orion Township, Michigan for production of the Chevrolet Silverado EV and the electric GMC Sierra, GM’s second assembly plant scheduled to build full-size electric pickups.

These investments, which will create 4,000 new jobs, are the latest step toward accelerating GM’s drive to become the EV market leader in North America by 2025, the company says. By the end of 2025, GM plans to have more than 1 million units of electric vehicle capacity in North America

The Orion and Ultium Cells Lansing investments announced will support an increase in total full-size electric truck production capacity to 600,000 trucks when both Factory ZERO and Orion facilities are fully ramped. GM has been the leader in U.S. full-size truck deliveries over the past two years. In addition, the company is investing in its two Lansing-area vehicle assembly plants for near-term product enhancements.

The announcements include investments in the following locations:

  • Orion Assembly for production of Chevrolet Silverado EV and electric GMC Sierra â€” GM is investing $4 billion to convert the facility to produce electric trucks using the GM-developed Ultium Platform, which gives the company the flexibility to build vehicles for every customer and segment. This investment is expected to create more than 2,350 new jobs at Orion and retain approximately 1,000 current jobs when the plant is fully operational. Electric truck production, including the Chevrolet Silverado EV and electric GMC Sierra, will begin at Orion in 2024. The Orion investment will drive significant facility and capacity expansion at the site, including new body and paint shops and new general assembly and battery pack assembly areas. Production of the Chevrolet Bolt EV and EUV will continue during the plant’s conversion. Site work begins immediately.
  • New Ultium Cells battery cell plant at Lansing site— GM and LG Energy Solution, via their Ultium Cells joint venture, are investing $2.6 billion to build Ultium Cells’ third U.S. battery cell manufacturing plant. This investment is expected to create more than 1,700 new Ultium Cells jobs when the plant is fully operational. Site preparations will begin this summer and battery cell production is scheduled to begin in late 2024. Ultium Cells Lansing will supply battery cells to Orion Assembly and other GM assembly plants.

 

Orion Assembly will become GM’s third U.S. assembly plant being transformed for production of Ultium-powered EVs. GM assembly plants in North America currently building, or being converted to build EVs, include Factory ZERO in Detroit and Hamtramck, Michigan; Spring Hill Assembly in Spring Hill, Tennessee; CAMI in Ingersoll, Ontario and Ramos Arizpe Assembly in Mexico. By the end of 2025, GM will have more than 1 million units of electric vehicle capacity in North America to respond to growing electric vehicle demand.

Share This Post

Recent Articles




Wordpress Social Share Plugin powered by Ultimatelysocial
error

Enjoy this post? Share with your network